top of page

Handicap Shower at CMC-Randolph

Completed:  February, 2016 

Handicap Shower at CMC-Randolph

 

Type of Facility:  Hospital

Client:  Carolinas HealthCare System

Size:  120 sf

Construction Cost:  N/A

Consultants:

Plumbing/Electrical:  CSE Engineering

Contractor:  Structure Services, Inc.

 

Project Description:

The design incorporates a new roll in shower stall to address the Pediatric Emergency Department of this psychiatric hospital facility. The shower is within a patient toilet room, and details to address clearances to all plumbing fixtures for the patient as well as anti-ligature design are met.

 

bottom of page